Bath Remodeling in Wilmington and Myrtle Beach
Full Bathroom Remodeling With One Crew and One Price
When the shower is only part of the problem, we update the whole room: the bathing area, vanity, top, sink, faucet, toilet and flooring. You deal with one company, our own employees do the work, and the price is set before we start.
- Everything in one package
- Our own installers
- Do it in phases if you like
- Price guaranteed

Everything in one package
Shower or tub, vanity, vanity top, sink, faucet, toilet, flooring and wainscoting on a single contract.
Our own installers
Employee installers, not day labor. The same company is responsible from tear-out to final cleanup.
Do it in phases if you like
Start with the shower or tub now and come back for the rest later to spread out the cost.
Price guaranteed
Your written price covers the agreed scope, with no hidden charges added at the end.
Who a full remodel is for
A full remodel makes sense when the vanity is falling apart, the floor is stained or soft, and the shower is dated all at the same time. Fixing one piece at a time can leave a new shower next to an old vanity that no longer matches.
It is also a common choice when buying an older home or getting a house ready for the next chapter. Many of our bath customers are planning to stay in their homes for years and want a bathroom that is safe and easy to use for the long run.
What can be included
Every bathroom project starts with the shower or tub. From there you choose which other pieces to replace. We plan the room as a whole so colors, finishes and heights work together.
Recent full remodels in Holly Ridge and along the beaches combined marble-look shower walls and glass doors with new vanities, vanity tops, fixtures, grab bars and flooring.
- Shower replacement, tub replacement or tub to shower conversion
- Vanity, vanity top, sink and faucet
- Toilet
- Flooring and wainscoting
- Shelving, seating and grab bars
Layout and accessibility choices
Removing a tub opens up options. A walk-in shower with a low threshold, a comfort-height vanity or a different door style can make a big difference in how the room feels day to day. We will point out what is practical in your space and what would require moving plumbing.
If someone in the home is dealing with balance or mobility issues, tell us at the consultation. Grab bar placement and seating are easiest to plan before work starts.
Schedule and living with the work
A full remodel takes longer than a shower swap, and the length depends on the size of the room and what you include. We give you the schedule at the consultation along with the price, so you know how long the bathroom will be out of use.
Our crews protect floors and hallways, keep the work area tidy at the end of each day, and leave the room clean when the job is done.
How your full bathroom remodel project works
- 01
Consultation and design
We visit at a time that suits you, including evenings and Saturdays by appointment, measure the room and help you choose finishes.
- 02
Written price and schedule
You receive the exact price and the expected number of work days before you sign anything.
- 03
Tear-out and rough work
Our crew removes the old fixtures and we schedule any plumbing changes needed.
- 04
Install and finish
Shower or tub, vanity, top, toilet and flooring go in, followed by fixtures and accessories.
- 05
Final walkthrough
We clean the room, test everything and go over care and warranty details with you.
Safety built in
A bathroom that stays easy to use for years
Ask about safety options at your consultation. They cost far less to add during the remodel than afterward, and they can look like part of the design.
- Low-threshold shower bases you step into, not over
- Grab bars anchored where you actually reach
- Textured, slip-resistant floors and seats

Full Bathroom Remodel projects
Homeowners remember the crew, not just the cabinets
“We are so very happy with our new kitchen. Austin, JT, and Jacob showed up on time, worked hard, did a great job and were very pleasant to be around. I am very pleased with the colors I chose and the facing and doors are excellent quality. They should serve us well for a long time.”

Carole VanGorder
Kitchen cabinet refacing
“Exceptional installer technicians! All three (John, Chase, and JT) went above and beyond to make our kitchen remodel perfect. Our cabinets look amazing and these guys took great care to measure and double measure to make sure everything lined up just right.”

Dianne Pieterse
Kitchen remodel
“Very professional installation. Our installers Austin, JT, and Jacob worked great as a team to get everything done quickly and efficiently. They made sure we were happy with every little detail before they left.”

Nancy Wescott
Kitchen installation
Bathroom Remodeling near you
We serve the Cape Fear coast from Wilmington and the Grand Strand from Myrtle Beach. Pick your town for local details.
Near our Wilmington, NC showroom
Other projects homeowners pair with this one

Walk-In Showers
A walk-in shower trades a tall tub wall or curb for a low-threshold pan you can step into easily. Add a seat, shelving and grab bars, and the bathroom stays safe and comfortable for as long as you live in the home.
Learn more
Tub to Shower Conversion
If the tub mostly collects dust and climbing over the edge is getting harder, we remove it and put a full-size acrylic shower in the same footprint. The work takes two days, with an overnight water test in between.
Learn more
Shower Replacement
If your shower has cracked grout, stubborn mildew or a pan that is starting to leak, we replace it with an acrylic pan and wall system built to stay clean. Our own installers take two days so the water can be tested overnight.
Learn more
Full Bathroom Remodel questions
Do not see your question? Call either office and you will reach someone local who can answer it.
How long does a full bathroom remodel take?
It depends on the size of the bathroom and what you include. We give you the schedule in writing at the consultation along with the price.
What makes a full remodel cost more or less?
The number of items you replace, the vanity and top you pick, flooring choices, whether plumbing has to move, and any repairs found during tear-out. Your price is exact and guaranteed once the scope is set.
Can I split the remodel into phases?
Yes. Many customers do the shower or tub first and have us come back later for the vanity, toilet and flooring. Doing it this way spreads out the cost.
Do you handle the plumbing yourselves?
Yes, it is all part of one contract. We schedule the drain, valve, toilet and faucet work, so you never have to hire a plumber yourself.
What if I only have one bathroom?
Let us know at the consultation. We will plan the order of work to keep the time without a working toilet and shower as short as possible.
What does the warranty cover?
Our craftsmanship has a 7-year warranty, and we match each manufacturer's product warranty with our own labor warranty.
Can I finance a full bathroom remodel?
Yes. We offer financing through MOMNT with payments as low as $149/month, subject to credit approval, and we take all major credit cards.
Your new kitchen or bath could be finished in days, not weeks
Book your free in-home consultation. We bring samples, measure the space and leave you with a written price, with no pressure to decide that day.
Request pricing
We will call within one business day to set up your visit.




