Shower Replacement · New Hanover County

Shower Replacement in Wilmington, NC

Shower replacement in Wilmington usually means pulling out a dated tub or a failing tile stall and installing a grout-free acrylic shower system in its place. Our own crew handles the tear-out, plumbing and install in about 2 days, with an overnight water test before we call it done.

Schedule a free in-home consultation

We will call to set a time. You get an exact written price at the visit.

Nearest office
Or call Wilmington: (910) 500-6811

We are a local company. We never sell or share your information.

  • Best of the Cape FearWECT winner 2024 and 2025
  • 7-year warrantyBBB Accredited remodeler
  • Employee ownedEmployee owned and operated
  • 1 to 3 day installsBaths in 2, kitchens in about 3
  • Financing availableBudget-friendly monthly plans

Shower Replacement for Wilmington homes

Hall baths in the brick ranches around Kings Grant, Bayshore and Wrightsboro were built around a 5-foot tub, and plenty of owners there now want a walk-in shower with a low curb, a seat and grab bars. In Northchase and Myrtle Grove, the common request is replacing a 1990s fiberglass stall that has yellowed or cracked. Wilmington's damp summers also push people away from tile, since acrylic walls do not hold mildew in grout lines the way an old tile surround does.

Wilmington projects are measured, quoted and installed by the team at our Wilmington showroom. Read more about shower replacement or see everything we do in Wilmington.

  • Two-day install

    Day one is tear-out and setup, day two is finish work. The overnight gap lets us test the water before we leave.

  • No grout to scrub

    Acrylic walls and pans have a smooth, non-porous surface that resists mold and mildew and wipes clean.

  • Up to 40% savings

    Our acrylic shower systems cost up to 40% less than typical replacement products.

  • Employee installers

    The installers in your bathroom work for Newberry, and we schedule any valve and drain work for you.

What we see in Wilmington homes

Wilmington's housing covers a wide span. Brick ranches from the 1960s and 1970s line streets in Kings Grant, Bayshore and Wrightsboro, many still with the original hall bath tub and oak or laminate cabinets. Neighborhoods like Northchase, Porters Neck and Myrtle Grove filled in through the 1980s, 1990s and 2000s with builder-grade kitchens that are now ready for a refresh, while newer communities such as Blue Clay Farms and the subdivisions off Skippers Corner bring plain stock cabinets and fiberglass tub units that owners want to upgrade. That mix is why most of our Wilmington work is tub-to-shower conversions, cabinet refacing and full bathroom updates in homes people plan to stay in.

  • Coastal humidity is hard on grout and painted cabinets, which is a big reason Wilmington owners choose grout-free acrylic walls and factory-finished refacing.
  • Some Wilmington neighborhoods have HOAs; interior remodels rarely need review, but we can provide product details if your association asks.
  • The showroom is open for scheduled visits so you can compare door styles and shower wall patterns before your in-home appointment.
  • We are a short drive from downtown, Midtown and the I-40 corridor, so scheduling around commutes is simple.

Neighborhoods we serve in and around Wilmington

  • Porters Neck
  • Ogden
  • Myrtle Grove
  • Kings Grant
  • Wrightsboro
  • Northchase
  • Bayshore
  • Blue Clay Farms
  • Silver Lake
  • Skippers Corner
How it works

What to expect in Wilmington

  1. 01

    Free in-home consultation

    We measure the space, look at the existing plumbing and show you samples. You get an exact written price before you decide.

  2. 02

    Order and schedule

    Your pan and walls are made to your measurements, and we book a two-day install that works for your household.

  3. 03

    Day one: tear-out and prep

    Our crew protects floors, removes the old shower, repairs what is behind it and sets the new pan.

  4. 04

    Day two: walls, fixtures and testing

    We install the walls, trim and door, review the water test from overnight, clean up and walk you through the finished shower.

Safety built in

A bathroom that stays easy to use for years

Ask about safety options at your consultation. They cost far less to add during the remodel than afterward, and they can look like part of the design.

  • Low-threshold shower bases you step into, not over
  • Grab bars anchored where you actually reach
  • Textured, slip-resistant floors and seats
Aging in place options
Walk-in shower with grab bars and a low threshold
Customer reviews

Homeowners remember the crew, not just the cabinets

  • “We are so very happy with our new kitchen. Austin, JT, and Jacob showed up on time, worked hard, did a great job and were very pleasant to be around. I am very pleased with the colors I chose and the facing and doors are excellent quality. They should serve us well for a long time.”
    Photo of Carole VanGorder

    Carole VanGorder

    Kitchen cabinet refacing

  • “Exceptional installer technicians! All three (John, Chase, and JT) went above and beyond to make our kitchen remodel perfect. Our cabinets look amazing and these guys took great care to measure and double measure to make sure everything lined up just right.”
    Photo of Dianne Pieterse

    Dianne Pieterse

    Kitchen remodel

  • “Very professional installation. Our installers Austin, JT, and Jacob worked great as a team to get everything done quickly and efficiently. They made sure we were happy with every little detail before they left.”
    Photo of Nancy Wescott

    Nancy Wescott

    Kitchen installation

FAQ

Shower Replacement in Wilmington: questions

Do not see your question? Call either office and you will reach someone local who can answer it.

How long does a shower replacement take in a Wilmington home?

Most acrylic shower replacements take about 2 days, followed by an overnight water test. Your consultant confirms the schedule for your bathroom during the in-home visit.

Can you convert the tub in my Kings Grant or Bayshore ranch into a walk-in shower?

In most cases, yes. We remove the tub, adjust the plumbing and install a shower base and walls sized to the opening, with options like a low threshold, seat and grab bars.

Where is your Wilmington showroom and do I need an appointment?

The showroom is at 3012 N Kerr Ave, Wilmington, NC 28405. Call (910) 500-6811 to set a time so a design consultant is available to walk you through shower systems and cabinet doors.

Do you work in older Wilmington homes like the ranches in Kings Grant and Bayshore?

Yes. Older ranch homes are a large share of our Wilmington work, especially hall bath tub-to-shower conversions and refacing original cabinet boxes that are still solid. We check framing, plumbing and cabinet condition at the free in-home visit before quoting.

What affects the price of a shower replacement?

The size of the shower, the wall pattern you choose, the type of door, any accessories like a seat or grab bars, and what we find behind the old walls all play a part. We give you an exact written price at the consultation, and that price is guaranteed.

Can I use my bathroom during the install?

The shower is out of service for the two install days. Your toilet and sink stay available unless they are part of the project. Most families plan on using another bathroom for one night.

Up to $3,000 off remodels

Get an exact price for shower replacement in Wilmington

Book a free in-home consultation. We measure, show samples and leave you with an exact written price.

CallWilmington CallMyrtle BeachFree QuoteIn-home visit